Joomla!
hepp family web site
  • Home
  • Gallery
  1. You are here:  
  2. Home
  3. Gallery
  4. Home Improvements
  5. Second Floor Addition

Moving on up! Here are the photos of the second story addition.

Home Improvements
Getting Ready (33)
Adding the Floor (28)
Water Leaks (15)
Adding the Walls (32)
The Outside (21)
Electrical (43)
Plumbing (21)
Heating and Cooling (29)
Insulation (26)
Drywall (40)
Studio Bath (50)
Master Bath (101)
Finish Work (61)
Stairs (52)
The Workers (16)
Adding Insulation (11)
Getting Ready
Getting Ready
Adding the Floor
Adding the Floor
Water Leaks
Water Leaks
 Adding the Walls
Adding the Walls
The Outside
The Outside
 Electrical
Electrical
Plumbing
Plumbing
Heating and Cooling
Heating and Cooling
 Insulation
Insulation
Drywall
Drywall
Studio Bath
Studio Bath
Master Bath
Master Bath
Finish Work
Finish Work
 Stairs
Stairs
The Workers
The Workers
Adding Insulation
Adding Insulation
Title
 
Play Slideshow Pause Slideshow
Powered by Phoca Gallery