Getting Ready
-
Getting the prep work done before we can build up, from getting the plans drawn up to getting the cement poured.
-
Adding the Floor
-
Adding the floor for the second story. We used engineered lumber including wooden I-Beams and trusses as a base for the second floor.
-
Water Leaks
-
We ended up with lots of water in the house during a storm.
-
Adding the Walls
-
The 2x4 boards are up and defining the space.
-
The Outside
-
Looking at the house as the neighbors see it.
-
Electrical
-
Adding electrical for the second story, and changing some things on the first floor.
-
Plumbing
-
Water comes in, water goes out. Proper plumbing makes it a safe journey.
-
Heating and Cooling
-
We added a new furnace upstairs, and replaced the furnace downstairs.
-
Insulation
-
Keeping the house warm and quiet.
-
Drywall
-
The drywall gives the rooms their final shape.
-
Studio Bath
-
The bathroom attached to the studio, making it a second master suite in a way.
-
Master Bath
-
The master bathroom with Jacuzzi tub, shower, and the most important seat in the house.
-
Finish Work
-
Dotting the I's and crossing the T's and making sure the rest of the alphabet is painted and caulked.
-
Stairs
-
Finishing the stairs to the second floor
-
The Workers
-
It takes lots of help for such a large project.
-
Adding Insulation
-
There wasn't quite enough insulation in the front of the house, so I had to add some more.